Description
Product Overview
The H20 Tower Crane Foundation Anchor is a structural anchoring component that provides the connection between the tower crane base structure and the concrete foundation. Embedded in the reinforced concrete foundation, the anchor forms the base connection onto which the tower crane mast sections are bolted, transferring the crane’s loads safely into the foundation. It is suitable for new installation, replacement and maintenance of fixed-base tower cranes.
Product Details Display

Specifications
| Item | Specification |
| Product Name | H20 Tower Crane Foundation Anchor |
| Part Number | H20 |
| System | Tower Crane Foundation / Base System |
| Equipment | Tower Crane |
| Application | Tower Crane Mast Foundation |
| Usage | New Installation / Replacement / Maintenance |
| Condition | New Replacement Spare Part |
| Function | Structural Connection and Anchorage |
| Installation | Concrete Foundation / Tower Crane Base |
| Component | Foundation Anchor |
Product Advantages
1. One Spare Part Covers New Builds, Replacements and Repairs
The H20 is specified for all three uses — pouring a fresh foundation, swapping a worn or damaged anchor, or carrying out maintenance work. That makes it a practical stock item for crane owners and fleet operators, since the same part number serves both installation and aftermarket repair scenarios.
2. Purpose-Built Load Path into the Foundation
The anchor is embedded in the reinforced concrete foundation so it forms the direct base connection onto which the first tower mast section is bolted, transferring the crane’s loads safely into the foundation. It is the structural link the whole fixed-base installation depends on, not a generic bracket.
3. Welding and Corrosion Treatment for Long Buried Service Life
The page states the anchor is processed with professional welding and surface treatment for corrosion resistance. That matters because a foundation anchor spends its working life buried in concrete where it can never be inspected or replaced — it has to be right on the first pour.
Our Advantages
- Professional supplier of tower crane spare parts
- Competitive pricing
- Stable supply and fast delivery
- Strict quality inspection before shipment
- Export experience to global markets
Compatibility
The exact anchor configuration, dimensions and installation method depend on the tower crane model and foundation design. Before ordering, confirm the original crane model, mast section type, anchor dimensions, bolt configuration and foundation requirements.
Manufacturing & Quality
Manufactured as a specialist tower crane steel component, each H20 foundation anchor is processed with professional welding and surface treatment for corrosion resistance and long service life. Every unit passes strict pre-shipment quality inspection.
FAQ
Q1: Are you a manufacturer or a trading company?
A1: We are a manufacturer specializing in tower crane steel components. Additionally, we act as an integrated supplier for other construction machinery and spare parts to provide a one-stop sourcing solution for our clients.
Q2: What is your standard delivery time?
A2: For items in stock, we can ship within 1-2 business days. For bulk orders or customized products, the lead time is typically 15-25 days, depending on the order volume.
Q3: How do you ensure product quality?
A3: Quality is our priority. We implement strict pre-shipment inspections for every order. Furthermore, we offer a 1-year warranty to ensure our clients’ peace of mind.
Q4: What are your packaging standards?
A4: We use standard export seaworthy packaging, including robust wooden cases and reinforced cartons. They are specifically designed to withstand the rigors of long-distance international shipping.
Q5: Which shipping methods do you support?
A5: We support multiple shipping channels, including Sea Freight (LCL/FCL), Air Freight, and International Express (DHL/FedEx/UPS), to meet different urgency and budget requirements.
Q6: Is the H20 foundation anchor reusable, or is it single-use?
A6: It is effectively single-use. The anchor is cast into the concrete foundation and stays there when the crane is dismantled, so a new anchor is required for every new foundation. The H20 is also listed as a replacement spare part, which is useful when an existing anchor is damaged or needs upgrading.
Q7: What measurements do I need to confirm before ordering?
A7: The page does not publish dimensions, weight, or a bolt pattern for the H20 — these vary with the crane model and foundation design. Before ordering, check the anchor dimensions and bolt configuration against your crane’s parts manual or foundation drawings and compare them with the supplier.
Q8: How is the H20 anchor installed?
A8: It is positioned in the foundation formwork, levelled, and secured against the reinforcement before the concrete is poured, so it is cast in permanently. After the concrete cures, the first tower mast section is bolted directly onto the embedded anchor. Accurate levelling before the pour is critical, because the anchor cannot be adjusted afterwards.










Reviews
There are no reviews yet.